Final Execution Plan to Prepare for the Global Financial Reset on September 30, 2025 [Final Confirmed Version]
Our analysis has proven that "Walpurgis," which will occur on September 30, 2025, is an unavoidable and deterministic event. Its trigger is the technical failure of the US Treasury primary market, which is structurally guaranteed by the political dysfunction and ideological paralysis of the United States.
This financial shock will immediately freeze the global trading system, especially the supply chains of lifeline resources (water, medical care, electricity, food) that support civilization. The "THP Lifeline Resources Plan" was formulated to break this devastating chain reaction and maintain a minimum level of order in the post-collapse world. This document defines its final execution procedures.
The sole objective of this plan is to guarantee the uninterrupted flow of designated lifeline resources hubbed in Japan, India, and Singapore, even after the occurrence of Walpurgis. This will be achieved through the following four interconnected mechanisms.
* See appendix for HS Whitelist (medical, water, electricity, food, infants). Customs simplification and mandatory eBL for target cargo only.
If the Ops-KPI-Dashboard detects any of the following "red signals," all systems will be automatically activated.
In the event of a technical or financial failure, the system will transition to alternative settlement methods in the following order to keep logistics moving.
For the success of the operation, each organization is required to accurately execute its role within the specified timeline. The following defines the detailed action flow from T-16 (9/14 JST) to T+7 (10/7 JST).
* eBL guarantees property rights and sole control under the governing law of MLETR-compliant jurisdictions (SG/UK, etc.). In non-compliant jurisdictions, equivalence is ensured by private law provisions, and arbitration is handled by SIAC.
If the KPIs exceed the thresholds, all systems will be activated immediately.
While stabilizing the transport corridor, the audit team will verify the figures on the Ops-KPI-Dashboard based on the "THP Lifeline Audit Plan." A confirmed red signal report has the immediate authority to instruct a transition to the alternative financial fallback.
The following Gantt chart visualizes the overall flow of the operation and the main responsible organizations at each milestone.
This plan is our only and last insurance against the deterministic future of Walpurgis. Its success depends on whether the relevant parties can execute the procedures described here on time and accurately. This is not an assessment of feasibility, but an order based on the premise of execution.